See a sample final audit — before you upload yours.
This is what comes back from a scoped drawing audit: the marked sheet, the finding, the sheet references, and the reason it matters before bid or issue.
First use is free. Results may be held if drawing quality isn’t audit-ready — we don’t promise every upload gets a full pack.
What’s in the pack
- Bluebeam-ready marked PDF
- One-page forensic summary with sheet references and finding context
- Excel/CSV companion for forwarding findings to Precon, VDC, or the project team
The marked sheet and shortened issue log on this page are the sample.
Sample report
Bluebeam-ready findings on the plan: verified door marks beside the door schedule.

- Sheet index gap — a sheet is listed in the index but missing from the set.
- Dead callout — a callout points to a detail that is not present or does not resolve.
- Door schedule mismatch — the door tag, schedule entry, and plan opening do not agree.
Sample issue log
A shortened companion to the marked sheet: the issue, the sheet, the description, and an estimated rework/risk for review.
| Issue Number | Issue | Sheet Number | Page Number | Issue Description | Estimated rework/risk |
|---|---|---|---|---|---|
| SBI-0001 | Incorrect Reference Detail | A101 | 1 | Callout symbols detail reference does not exist. | $2,000 |
| SBI-0002 | Missing Sheets | A101 | 1 | Sheet A102 is listed in the sheet index but is not included in the set. | $500 |
| SBI-0003 | Missing From Schedule | A101 | 1 | Door tag 104 is shown on the plan and has no matching door-schedule row. | $5,000 |
| SBI-0004 | Missing From Schedule | A130 | 4 | Door tag 118 on the plan does not appear in the door schedule. | $5,000 |
| SBI-0001 | Incorrect Reference Detail | A131 | 5 | Callout symbols detail reference does not exist. | $2,000 |
| SBI-0005 | Missing From Schedule | A131 | 5 | Door tag 203 is tagged on the plan but missing from the door schedule. | $5,000 |
| SBI-0006 | Missing From Schedule | A132 | 7 | Door tag 210 on the plan does not match the width listed in the door schedule. | $5,000 |
| SBI-0007 | Missing From Schedule | A135 | 9 | Door tag 221 is on the plan opening and is absent from the door schedule. | $5,000 |
| SBI-0008 | Missing From Schedule | A140 | 14 | Door tag 305 hardware group on the plan does not match the door schedule. | $5,000 |
| SBI-0009 | Missing From Schedule | A147 | 21 | Door tag 412 is shown at the corridor and is not on the door schedule. | $5,000 |
| SBI-0010 | Missing From Schedule | A151 | 25 | Door tag 418 fire rating on the plan does not agree with the door schedule. | $5,000 |
| SBI-0011 | Missing From Schedule | A102 | 2 | Door tag 109 is on the plan and missing from the door schedule. | $5,000 |
Estimated rework/risk is illustrative marketing framing for typical field/RFI exposure — not a quote or guarantee.
How to read the markups in Bluebeam
Open the marked PDF in Bluebeam, follow the cloud and sheet reference, and resolve the finding in the drawing workflow your team already runs. markedup.ai flags the relationship; your project team remains responsible for the design decision.
ConstructionProof is the drag-and-drop path. It is not a separate drawing system.